Coal powder
Home / Projects / Coal powder

Bituminous coal grinding line
Equipment: 1 LM2200M vertical mill
Material and fineness: Bituminous coal, moisture <15%, HGI index >52, 200 mesh D90, final moisture <5%
Request a catalog and quote

Introduction
The project has been in operation since 2018 for a renowned pulverized coal company in Gansu. Drawing on its experience, the client: professionally selected the equipment; implemented a two-stage process; and achieved high efficiency (630 kW for the mill + 400 kW for the fan). Liming's technical team provided personalized support, highlighting the competitive advantages of each model to optimize the investment.
Recommended products
